1.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device reduce the steel to tiny areas use for suited welding and splicing
2)welding
right after steel chopping procedure the following step is welding .this process the primary work is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding approach.this variety of welding is quite
special .its solely utilized in I beam welding .after this welding method other areas of the trailer will be use distinct welding way
for diverse metal-argon arc welding-electric powered arc welding-guide welding-gasoline welding and so on
three)blasting
this approach is use for the very first action of floor cleanness-anxiety aid-derusting ahead of paiting .
4)electrophoresis coating
this approach use for far more detail area cleanness
five)epoxy zinc primer spray coating
this approach is the lasting 1 prior to paiting .after this process the trailer an be paiting
6)assembly
right after all the procedure we have mationed .the final treatment of the trailer is assembly.this process all the areas will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
seven)packing
The very last procedure is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer