one.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/nine./8./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma chopping equipment lower the steel to small parts use for suited welding and splicing
2)welding
right after metal chopping method the up coming stage is welding .this method the main work is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this procedure will be use submerged arc welding procedure.this type of welding is quite
specific .its solely utilised in I beam welding .soon after this welding process other areas of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electric arc welding-manual welding-gasoline welding and so on
3)blasting
this approach is use for the 1st action of floor cleanness-stress relief-derusting ahead of paiting .
4)electrophoresis coating
this approach use for a lot more detail surface cleanness
5)epoxy zinc primer spray coating
this method is the long lasting 1 before paiting .after this method the trailer an be paiting
6)assembly
right after all the process we have mationed .the very last method of the trailer is assembly.this process all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
seven)packing
The final approach is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer